Tag Archives | Janzur Coastal Depot

Brega Pre-Qual for Pre-Engineering Studies

The Brega Petroleum Marketing Company (BPMC) has announced pre-qualification for preparetion of pre-Engineering studies, scope of work, cost estimation and ITB for the of installation of (SPM) project for Janzur Coastal Depot. The main items for the required work are summarized as follows: A - Conducting the (EIA) environmental impact Assessment of the project. B […]