First Blades Arrive for Emsalata Wind Farm

By John Lee.

Libya Herald has reported that the first giant blades for the 27-MW wind farm at Emsalata have been unloaded at Khoms, and have been transported to construction site near the town.

The wind farm will eventually have 16 turbines on 71-metre-high towers.

Each turbine will consist of three 40-metre-long blades, each weighing eight tons.

(Source: Libya Herald)

(Renewable Energy image via Shutterstock)

No comments yet.

Leave a Reply