Well Design:
- 20 Conductor pre-set
- 17 ½” hole – 13 3/8” casing to 3300 feet
- 12 ¼” hole – 9 5/8” casing to 7600 feet
- 8 ½” hole – 7” Liner 11,000 to 7400 feet
- 1000 feet of 3 ½” EUE Kill string run in hole prior to rig release
Main Components:
- 750 HP, trailer or truck fast moving, depth rating to 12,000 feet workover rig with drawworks having a double drum for swabbing operations, complete with minimum 15,000 feet sandline.
- The rig must be in Libya.
- Drilling Substructure and / or working platform 300,000 lbs lifting capacity
- Rotary table or Power Swivel able to deliver 10,000 ft lbs torque at 12,000 feet with 3 ½” Drill pipe and 4 ¾” drill collars
- 2 x 500 HP mud pumps
- 800 – 1200 bbls mud system
- 800 – 1200 bbls water storage
- High speed shale shakers, desander and destiler
- Adequate electrical power all equipment including 3rd party well testing equipment
- 5,000 psi BOP
- 5,000 psi choke manifold
- 12,000 feet 3-1/2” Grade G pipe
- 4-3/4” Drill Collars (18)
- 9-5/8” casing scrapper
- 7” casing scrapper
- Mousehole and Rathole and equipment to install same
- Minimum 75 man master-skidded camp
- Wellsite Office for Company Supervisor
- Wellsite Office for Well Testing Engineer / Night Supervisor
- Wellsite Sleepers for Supervisors (2), Safety/Operations Supervisor (2)
Page 2 of 4