Personnel:
- All Key Personnel Drillers, Assistant Drillers, Toolpushers, and Superintendents) are English-speaking and to be certified with IWCF Supervisor level (for Toolpushers and Superintendents) and Drillers level (for Drillers and Assistant Drillers) and industry-standard Safety Training for the Rig Operations.
Camp:
- The mobile main camp equipped with accommodation, kitchen and dining facilities, clinic, recreational and Prayer room(s) for a minimum of 120 persons (consisting of Contractors personnel, Company’s staff and subcontractors). The camp must have sewage treatment plant and general waste collection system as per Contractor’s disposal plan.
- The rig site camp equipped with fully air-conditioned crew break room with hot and cold drinks, full equipped. (Dinning room) for hot and cold meals for people based on rig site and shift personal. meeting room, prayers room on rig site offices and sleeping accommodations for Contractor’s senior personnel, Company Drilling Supervisor, Assistant Drilling Supervisor, HSE and Geologist personnel
Page 3 of 4