Tag Archives | Bouri

Rada arrests Mellitah Execs in Fraud Probe

Libya Herald reports that four senior executives from Mellitah Oil and Gas have been detained in Tripoli over an alleged fraud involving the new $425-million GAZA Floating, Storage, Offloading Marine Terminal (FSO) (pictured) at Bouri Offshore Field. They were detained by the Rada Deterrence Force, which alleges that they abused their authority and wasted public […]

First Tanker Loads at GAZA Marine Terminal (FSO)

On Saturday 11 February 2017, the first crude oil vessel was loaded at GAZA Floating, Storage, Offloading Marine Terminal (FSO) in Bouri Offshore Field, which was launched to replace Sloug Floating Storage Offloading (FSO) and to be included within the oil operations system of Mellitah Oil and Gas Company. The floating Storage was manufactured by […]

Mellitah Tender for Supply Vessels to Bouri Field

The Mellitah Oil & Gas Company (Libyan Branch) intends to issue the tender below and wishes to invite reputable, interested and experienced contractors specialized in providing similar services for pre-qualification. The Pre-Qualification submission will be evaluated for establishing the Bidders List for the said tender. TENDER NO. (832) Provision of Supply Vessels to Bouri Field. […]

Mellitah Tender for Fire-Fighting System

The Mellitah Oil & Gas Company (Oil Division) intends to issue the below tender and wishes to invite for pre-qualification interested, experienced and reputable Companies specialized in providing similar services stated below to submit all requirements for inclusion in the bidders list to be invited to participate in the following tender: Tender No. (815): DP4 […]

$500m Floating Oil Terminal arrives from S Korea

A new $500-million floating oil rig has arrived in Libyan coastal waters from South Korea. The Gaza Floating, Storage, Offloading Marine Terminal (FSO) was built by STX and delivered to the Mellitah-operated offshore Bouri field, 120 km northwest of Tripoli, according to Libya Herald. It will replace the existing, Sloug FSO, which has been on […]

New Gas and Condensates Discovery

Eni has made a new discovery of gas and condensates offshore Libya, in the Bouri North exploration prospect in Area D, 140 kilometers from the coast and 20 kilometers north of the production field of Bouri. The discovery was made through the A1-1/1 well, drilled at a water depth of 125 meters, which encountered gas […]

Tender for HVAC System Upgrade

The Mellitah Oil & Gas Company intends to issue the tender below and wishes to invite for pre-qualification interested, experienced and reputable companies specialized in providing similar services for inclusion in the bidders list: Tender No. (584) Contract Area “C” Bouri Field DP3 & DP4 Platforms HVAC System Revamping/Upgrade Scope of Work: The overall scope […]